top of page
All Posts


Alpha Bravo Taxiway Rehabilitation
Sector: Aviation Location: Manchester Airport Group (MAG) Client: Manchester Airport (MAN) Value: £2,800,000 Scope: Removal and reinstatement of Airfield Ground Lights (AGLs). Replacement of Pavement Quality Concrete (PQC) bays. Asphalt inlay & overlay, including installation of reinforcement mesh. Removal & reinstatement of line markings 1,500M2. Increases to drainage levels. Earthworks re-grade to ensure compliance with airfield design standards. Summary: Through our reg
Allied Infrastructure
Feb 93 min read


EMA Runway Closures
Sector: Aviation Location: East Midlands Airport (EMA). Client: Manchester Airport Group (MAG). Value: £1,472,396 Scope: Traffic Management. Localised asphalt patching to runway. Removal and replacement of centre-line Airfield Ground Lights (AGLs). Over-banding. Refreshing of line-markings. Stabilisation and replacement of edge lights. Rubber removal. Maxi-flex works. Air Traffic Control (ATC) pit and duct surveys. Summary: Allied Infrastructure were appointed to the M
Allied Infrastructure
Feb 84 min read


Newcastle Airport Runway Re-surfacing
Sector: Aviation Location: Newcastle Airport Client: Tarmac (Principal Contractor) Value: £1,016,000 Scope: AGL Civils. Duct installation. Summary: In 2023, Allied Infrastructure was appointed to deliver a package of specialist civils associated to the re-surfacing of Newcastle Airport’s single runway, by the Principal Contractor Tarmac. This included the removal and re-installation of the Airfield Ground Lighting (AGL) units, as well as civils associated with the install
Allied Infrastructure
Feb 71 min read


Cloughbank A Drainage Remedial Trial
Sector: Aviation (landside). Client: Manchester Airport Group (MAG). Value: £2,100,000. Scope: Site clearance. Service clearance. Removal of the existing limestone aggregate and asphalt surfacing Installation of FORMAVOID © drainage system Installation of new kerbing to the carriageway. Installation of a new asphalt spine road, and porous asphalt surfacing of the parking areas Installation of new line marking, street furniture (including bus shelters) and lighting columns I
Allied Infrastructure
Feb 62 min read
bottom of page
