Alpha Bravo Taxiway Rehabilitation
Sector: Aviation Location: Manchester Airport Group (MAG) Client: Manchester Airport (MAN) Value: £2,800,000 Scope: Removal and reinstatement of Airfield Ground Lights (AGLs). Replacement of Pavement Quality Concrete (PQC) bays. Asphalt inlay & overlay, including installation of reinforcement mesh. Removal & reinstatement of line markings 1,500M 2 . Increases to drainage levels. Earthworks re-grade to ensure compliance with airfield design standards. Summary: Through our

Allied Infrastructure
Feb 93 min read


EMA Runway Closures
Sector: Aviation Location: East Midlands Airport (EMA). Client: Manchester Airport Group (MAG). Value: £1,472,396 Scope: Traffic Management. Localised asphalt patching to runway. Removal and replacement of centre-line Airfield Ground Lights (AGLs). Over-banding. Refreshing of line-markings. Stabilisation and replacement of edge lights. Rubber removal. Maxi-flex works. Air Traffic Control (ATC) pit and duct surveys. Summary: Allied Infrastructure were appointed to the

Allied Infrastructure
Feb 84 min read


Newcastle Airport Runway Re-surfacing
Sector: Aviation Location: Newcastle Airport Client: Tarmac (Principal Contractor) Value: £1,016,000 Scope: AGL Civils. Duct installation. Summary: In 2023, Allied Infrastructure was appointed to deliver a package of specialist civils associated to the re-surfacing of Newcastle Airport’s single runway, by the Principal Contractor Tarmac. This included the removal and re-installation of the Airfield Ground Lighting (AGL) units, as well as civils associated with the install

Allied Infrastructure
Feb 71 min read


Cloughbank A Drainage Remedial Trial
Sector: Aviation (landside). Client: Manchester Airport Group (MAG). Value: £2,100,000. Scope: Site clearance. Service clearance. Removal of the existing limestone aggregate and asphalt surfacing Installation of FORMAVOID © drainage system Installation of new kerbing to the carriageway. Installation of a new asphalt spine road, and porous asphalt surfacing of the parking areas Installation of new line marking, street furniture (including bus shelters) and lighting columns

Allied Infrastructure
Feb 62 min read


November Alpha PQC Bay Replacements
Sector: Aviation Location: Manchester Airport Client: Manchester Airport Group (MAG). Value: £1,200,000. Scope: Service Clearance. Saw-cutting, break out and replacement of Pavement Quality Concrete (PQC) bays associated to Stand 112. Asphalt surfacing, with installation of Glasgrid© pavement reinforcement system with the central Taxiway. Polymer grout stabilisation of concrete bays. Removal and re-installation of cable chases. Removal and re-installation of Airfield Grou

Allied Infrastructure
Feb 53 min read


Brize Norton, Runway & Taxiway Surface Preservation
Sector: Aviation / Defence. Location: RAF Brize Norton Client: Amey Defence Services Value: £1,000,000 Scope: Rubber removal to runways. Runway joint and crack repairs. Surface preservation treatment of runways and taxiways using Rhinophalt. Re-application of line markings. Friction testing (post-treatment). The total surface area treated was 458,260M 2 , with 229,000 litres of Rhinophalt and 115 tonnes of Rhinodust used in total. Summary: RAF Brize Norton is a high-profi